Pollution Control for Plating

Exploring the: Pollution Control for Plating Zone

52 Results for: News

Sort by:
Published: 3/31/2017

In Memoriam: Dick Crain
Richard Wedding “Dick” Crain, active member in the metal finishing community, passed away on March 26 at the age of 83.

Published: 1/30/2017

Hazard Waste Management Hours Per Week
Hazardous waste management is one of the hardest responsibilities of a finishing shops due to the regulatory requirement of local, state and federal agencies. The average plating shop in the 2016 Products Finishing Top Shops Benchmarking Survey spen...

Published: 1/11/2017

Lou Hirbour, former Technic VP, passes
Hirbour had been with Technic for 50 years, beginning as a salesman in the Northeast U.S. in 1961. In later years, he developed Technic’s West Coast regional sales operations and was instrumental in opening the Asian markets for Technic products.

Published: 1/11/2017

Scrap/Rework Rate as a Pct of Shop Sales
We surveyed plating shops on their scrap and rework rates, and asked them to determine what it was as a percentage of overall sales. The Top Shops came in at a much higher rate of 4.0 percent, which may mean they scrutinize their finished parts more...

Published: 12/6/2016

Environmental Management Hours Per Week
The 2016 survey showed that Top Shops spent 40 hours per week in environmental management. The average was 26.5 hours and the median was 10 hours. Those shops that are not in the Top Shops program were spending around 2.5 hours per week in environme...

Published: 11/1/2016

NASF Report: West Coast Competition Highlights 16 Design Students
Sixteen students compete for scholarship awards through NASF's Bright Design Challenge West Coast.

Published: 11/1/2016

Southern California Platers Search for PFOS Alternatives
SCAQMD, the air pollution control agency for Orange County and the urban portions of Los Angeles, Riverside and San Bernardino counties, requires platers to use a SCAQMD-certified chemical fume suppressant.

Published: 10/18/2016

Survey: On-Time Delivery Rate
On-time delivery rate is a crucial factor in customer service when it comes to the finishing industry. In our Top Shops Benchmarking Survey for electroplaters, the top 20 percent of shops had a 99.0 percent on-time rate; all other shops had a 90.0 p...

Published: 10/18/2016

Asterion White Paper Details How Water Selection Impacts the Plating Process
“Water and the Plating Process” is authored by technical sales engineer Jake Fisher, and details how water plays an integral and critical role in the plating process.

Published: 8/16/2016

Blair Vandivier Named a Fellow by the NASF
Honor recognizes those NASF members that have made significant and lasting contributions through their leadership and dedicated service.