xxx
PF Zone: Nickel Plating

Have A Finishing Question?

Most Recent Content in this Zone:

Plating Clinic: EN Plate-Out on Equipment
Q. We run a low-phosphorous electroless nickel bath and recently pulled quite a few pounds of nickel pellets from our tank after draining. How do we prevent this kind of plate-out?
Lou Hirbour, former Technic VP, passes
Hirbour had been with Technic for 50 years, beginning as a salesman in the Northeast U.S. in 1961. In later years, he developed Technic’s West Coast regional sales operations and was instrumental in opening the Asian markets for Technic products.
Scrap/Rework Rate as a Pct of Shop Sales
We surveyed plating shops on their scrap and rework rates, and asked them to determine what it was as a percentage of overall sales. The Top Shops came in at a much higher rate of 4.0 percent, which may mean they scrutinize their finished parts more carefully.
Pioneer Metal Finishing Relocates to New Hope, Minnesota
The New Hope facility will feature advanced technology and disciplined manufacturing processes to keep Pioneer at the forefront of the metal finishing industry.
Ken Gatchel, former AESF President, Passes
Gatchel was the AESF national president in 1997-98, the third to be elected from the Grand Rapids Branch since the society's founding in 1909. He served 10 years on the AESF national board of directors.

View More Content in This Zone  |  RSS RSS  |  Atom Atom

Suppliers | Products | Experts | News | Articles | Calendar | Process Zones

The Voice of the Finishing Industry Since 1936 Copyright © Gardner Business Media, Inc. 2016

Subscribe | Advertise | Contact Us | All Rights Reserved