The Voice of the Finishing Industry since 1936

  • PF Youtube
  • PF Facebook
  • PF Twitter
  • PF LinkedIn
1/8/2009

ACE Equipment

Facebook Share Icon LinkedIn Share Icon Twitter Share Icon Share by EMail icon Print Icon

ACE will exhibit its high-efficiency Hybrid burn-off oven system with a design that provides 93% efficiency.

Share

Facebook Share Icon LinkedIn Share Icon Twitter Share Icon Share by EMail icon Print Icon
ACE will exhibit its high-efficiency Hybrid burn-off oven system with a design that provides 93% efficiency. The radiant tube presents convection and radiant heat to the main chamber providing uniform temperatures of ±10°F. This system is designed to clean paint and powder hooks, racks, fixtures, load bars, grating, reject parts and even sensitive materials such as aluminum.

Resources